Updates to the South London and Thameslink Route.

The South London and Thameslink route combines the South London Network, London to Brighton and London to Bedford, although work in progress this will be a route that Covers Bedford to Brighton Via London Bridge, as well as the Suburbs of the Southern Network around London, Beckenham Junction, Hove and Reigate. Here are several work in progress shots on the Birkbeck Section of the route.

Beckenham Junction

Work in Progress pictures of Beckenham Junction

Screenshot_South London and Thameslink_51.41103--0.02590_00-30-39

Screenshot_South London and Thameslink_51.41076--0.02684_09-30-09

Screenshot_South London and Thameslink_51.41101--0.02612_09-30-36

Beckenham1

Birkbeck

Work in Progress pictures of Birkbeck Station

Screenshot_South London and Thameslink_51.40393--0.05554_00-30-14

Screenshot_South London and Thameslink_51.40360--0.05500_09-30-11

Screenshot_South London and Thameslink_51.40383--0.05510_09-30-03

Screenshot_South London and Thameslink_51.40392--0.05557_10-00-22
Birkbeck Line

Work in Progress pictures of the Beckenham Junction to Crystal Palace Section.

avenueroad

Screenshot_South London and Thameslink_51.40425--0.05481_17-30-23

Screenshot_South London and Thameslink_51.40197--0.06011_10-00-02

Screenshot_South London and Thameslink_51.40330--0.06881_17-30-16

Screenshot_South London and Thameslink_51.40073--0.06197_17-30-06

Screenshot_South London and Thameslink_51.40183--0.06144_17-30-15

Screenshot_South London and Thameslink_51.40172--0.06339_17-30-23

Screenshot_South London and Thameslink_51.40350--0.06838_17-30-55

Screenshot_South London and Thameslink_51.40273--0.05794_09-30-17

Leave a Reply